31
Ara
Survey, feasibility study, preliminary design and detailed design of 25 km single track mix use (Passenger + Freight) conventional railway with 80 km/h design speed between Suveren – Gozertepe. The project includes 2 stations, 1 siding station, 7 tunnels with the total length of 6,618.50 m, 7 bridges with the