RVNL Bhanupalı-Bılaspur-Berı T8-T10

This project includes Detailed Design and Project Management Consultancy services during preconstruction and construction stage of various works in connection with construction of Tunnel no. 8 to Tunnel no. 10 and will broadly involve related railway formation works, drainage system, stability of slope on approaches of these Tunnels including minor

04
Kas
RVNL Bhanupalı-Bılaspur-Berı T11-T16

This project includes Detailed Design and Project Management Consultancy services during preconstruction and construction stage of various works in connection with construction of Tunnel no. 11 to Tunnel no. 16, bridges, cutting locations, yards and will broadly involve related railway formation works, drainage system, stability of slope on approaches of

04
Kas
RVNL Rıshıkesh Package-9

The project includes survey, detailed design, engineering services, construction supervision, and project management consultancy for the section, between 117+365 to 125+320 (7.955 km), of a single line broad gauge railway, connecting Riskikesh to Karanprayag. The project includes 2 tunnels, 1 bridge with a length of 130m, and 1 station with

27
Eyl
RVNL Rıshıkesh Package-4

Rail Vikas Nigam Limited, India Name of Work : Detailed Design and Project Management Consultancy for Construction of tunnels (with both NATM and TBM alternative), yards and formation works from Chainage 47+360 to 63+117 (15.757 km) under Package-4 in connection with new single line Broad Gauge rail link between Rishikesh

03
Eki
Raılway and Road connectıons to Fılyos Port

Survey, detailed design and engineering services of 12.005 km single track conventional mix use (freight + passanger) railway with 50 km/h operation speed connecting Filyos Industrial Zone to Filyos Port, and 4.27 km² lane (2x1) connection road. The project includes 2 stations, 1 overpass bridge, 1 highway bridges with a

03
Eki
Erzurum Raıl System

Survey, feasibility detailed design and engineering services of 19 km double - track tramway line connecting major locations within the city of Erzurum with 50 km/h operation speed. The project includes 15 stations.  

03
Eki
Kecıoren Kuyubası Metro Lıne

  Survey, feasibility, detailed design and engineering services of 11.24 km double tube metro line with 120 km/h operation speed. The project includes 5 underground stations, 190,000 m² depot area, 1500 V DC third line rail electrification, 11.24 km double tube metro tunnel, all infrastructure works, track works, superstructure and

17
Nis
Erzıncan Dıyarbakır Mardın Raılway

Survey, feasibility, preliminary design and detailed design of 405.08 km double track mix use conventional railway between Erzincan – Diyarbakir – Mardin provinces. The project includes 166.62 km tunnel (144.1 km NATM Tunnels), 26,298 m bridges/viaducts, 5 stations and 5 siding stations, 3,047.09 m boring, 810 km² topographical survey, engineering

31
Ara
Suveren Gozertepe Raılway

Survey, feasibility study, preliminary design and detailed design of 25 km single track mix use (Passenger + Freight) conventional railway with 80 km/h design speed between Suveren – Gozertepe. The project includes 2 stations, 1 siding station, 7 tunnels with the total length of 6,618.50 m, 7 bridges with the

16
Mar
Izmır Lıght Raıl System (Evka 3 – Bornova)

Survey, feasibility, detailed design and consultancy services of 1.146 km metro line with 80 km/hr operation speed in Izmir. The project includes 1.146 km tunnel with the cross - sectional area of 140.18m, structural, architectural, mechanical, electrical design of stations, electrification, signalization, and telecommunication systems.