Survey, feasibility, detailed design and engineering services of 11.24 km double tube metro line with 120 km/h operation speed.
-
Contract Date: 2018
-
client: General Directorate of Infrastructure Investments
-
Name of Work: Surveying, Detailed Design and Engineering Services of Erzurum Train Station - Ataturk University Campus - Medical Faculty - Training and Research Hospital - City Hospital - Yavuz Sultan Selim Boulevard - Tramway Line