Survey, feasibility, preliminary and detailed design and engineering services of 158.78 km double-track high-speed railway line with 250 km/h operation
-
Contract Date: 2018
-
client: General Directorate of Infrastructure Investments
-
Name of Work: Surveying, Detailed Design and Engineering Services of Erzurum Train Station - Ataturk University Campus - Medical Faculty - Training and Research Hospital - City Hospital - Yavuz Sultan Selim Boulevard - Tramway Line

