Survey, feasibility, detailed design, and engineering services of 4 lane (2x2) 16,4 km highway. The project includes 1 tunnel with
-
Contract Date: 2018
-
client: General Directorate of Infrastructure Investments
-
Name of Work: Surveying, Detailed Design and Engineering Services of Erzurum Train Station - Ataturk University Campus - Medical Faculty - Training and Research Hospital - City Hospital - Yavuz Sultan Selim Boulevard - Tramway Line