Design, Engineering, supervision, and consultancy services of Textile Factory Building and facilities. The project includes detailed structural, architectural, electrical and
-
Contract Date: 2017
-
client: General Directorate of Infrastructure Investments
-
Name of Work: Surveying, Detailed Design and Engineering Services of the Metro Line between Keçiören Kuyubaşı Station - High Speed Train Station
Kecıoren Kuyubası Metro Lıne
Survey, feasibility, detailed design and engineering services of 11.24 km double tube metro line with 120 km/h operation speed. The project includes 5 underground stations, 190,000 m² depot area, 1500 V DC third line rail electrification, 11.24 km double tube metro tunnel, all infrastructure works, track works, superstructure and stations, structural, architectural, electrical and mechanical works, signalization and telecommunication works.