Kecıoren Kuyubası Metro Lıne

 

Survey, feasibility, detailed design and engineering services of 11.24 km double tube metro line with 120 km/h operation speed. The project includes 5 underground stations, 190,000 m² depot area, 1500 V DC third line rail electrification, 11.24 km double tube metro tunnel, all infrastructure works, track works, superstructure and stations, structural, architectural, electrical and mechanical works, signalization and telecommunication works.

Related Projects