Survey, feasibility, detailed design, and engineering services of 10.96 km highway 4 lane (2x2) highway in Sakaltutan. The project includes
-
Contract Date: 2014
-
client: General Directorate of Highways
-
Name of Work: Surveying, Detailed Design and Engineering Services of Ahmediye Tunnel





