11
Eki
Construction supervision services of 4 lane (2x2) 45.5 km highway. The project includes 123 culverts, 5 overpasses, 7 underpasses, 2 bridges with a total length of 2,146 m.
Construction supervision services of 4 lane (2x2) 45.5 km highway. The project includes 123 culverts, 5 overpasses, 7 underpasses, 2 bridges with a total length of 2,146 m.
Construction supervision and consultancy services of 106 km highway between Diyarbakir – Mardin, Turkey. The project includes earthworks, engineering structures such as culverts, bridge, plant mix sub-base, plant mix base, hot bituminous mixture pavement
It is one of the most prestigious and unique transportation projects in Turkey’s history. It connects Asian side of Istanbul to European side under Bosporus strait dropping substantially traffic congestions of the suspension bridges crossing the strait. The project includes construction supervision of 15.02 km 2x2 and 2x3 roads, 3.34
Construction supervision and consultancy services of 27.5 km double-track high speed railway with 250 km/h operation speed. The project includes 25 culverts, 11 underpasses, 3 overpasses, 9 viaducts with the total length of 2,099 m, 1 bridge with the length of 30 m, 2 cut & cover tunnels with the
The generated Lorem Ipsum is therefore always free from repetition, injected humour, or non-characteristic words etc,generated Lorem Ipsum is therefore always free from repetition, injected humour, or non-characteristic words etc.
Praesent a dui in tortor eleifend pellentesque vel eget sem. Duis et ipsum molestie, faucibus leo a, facilisis elit. Donec lobortis consequat turpis vel molestie.
"On the other hand, we denounce with righteous indignation and dislike men who are so beguiled and demoralized by the charms of pleasure of the moment, so blinded by desire, that they cannot foresee the pain and trouble that are bound to ensue; and equal blame belongs to those who
Feasibility, detailed desing, engineering, construction supervision, andconsultancyservices of 01's Factory. The project includes biological and chemical treatment plant with capacity of 32,000 m³/day, 3 water eeservoirs with capacity of 18,150 m³, 5 pumping stations with capacity of 390 lt/s, Cl2 chlorination station with capacity of 340 lt/s, ventilation station with