Construction supervision, consultancy and engineering services of 25,6 km high speed railway with 160 km/h operation speed, 1 metro line
-
Contract Date: 2021
-
client: Rail Vikas Nigam Limited
-
Name of Work: DETAILED DESIGN & for PROJECT MANAGEMENT CONSULTANCY For "Construction Of Tunnels T11 To T16 From Chainage Km 31+800 To Km 48+962, Station Yards And Works Related To Minor Bridges And Formation On Approaches Of Such Tunnels In Connection With New Single Line Broad Gauge Rail Link Between Bhanupalibilaspur- Beri In The State Of Himachal Pradesh,India."
RVNL Bhanupalı-Bılaspur-Berı T11-T16
This project includes Detailed Design and Project Management Consultancy services during preconstruction and construction stage of various works in connection with construction of Tunnel no. 11 to Tunnel no. 16, bridges, cutting locations, yards and will broadly involve related railway formation works, drainage system, stability of slope on approaches of these Tunnels including minor bridges on such approaches, between km 31+800 to km 48+962 and Bilaspur Station.