Design, Engineering, supervision, and consultancy services of Textile Factory Building and facilities. The project includes detailed structural, architectural, electrical and
-
Contract Date: 2014
-
client: General Directorate of Turkish State Railways
-
Name of Work: Surveying, Design, Engineering and Consultancy Services of Suveren-Gözertepe Railway
Suveren Gozertepe Raılway
Survey, feasibility study, preliminary design and detailed design of 25 km single track mix use (Passenger + Freight) conventional railway with 80 km/h design speed between Suveren – Gozertepe. The project includes 2 stations, 1 siding station, 7 tunnels with the total length of 6,618.50 m, 7 bridges with the total length of 1,917.50 m, miscellaneous, secondary works, railway safety works.