20
Ara
Eskısehır Antalya Hıgh Speed Raılway

Survey, feasibility, preliminary and detailed design, and engineering services of 654.74 km double-track highspeed railway line with 250 km/h operation speed. Minimum curvature radius is 3,500 m, and maximum vertical slope is 1.6 %. The project includes 10 stations, 840 culverts, 368 underpasses, 73 overpasses, 188 bridges and viaducts with

17
Ara
Kahramanmaras Goksun Hıghway

Survey, feasibility, preliminary and detailed design, and engineering services of 4 lane (2x2) 22.96 km highway between Kahramanmaras and Goksun. The project includes 3 bridges with a total length of 940 m, 1 single stretch double tube tunnel with a length of 4.41 km, detailed digital mapping, traffic studies. [gallery

11
Oca
Eren Holdıng Wastewater Treatment Plant

Feasibility, detailed desing, engineering, construction supervision, andconsultancyservices of  01's Factory.  The project includes biological and chemical treatment plant with capacity of 32,000 m³/day, 3 water eeservoirs with capacity of 18,150 m³, 5 pumping stations with capacity of 390 lt/s, Cl2 chlorination station with capacity of 340 lt/s, ventilation station with

08
Kas
Aydın Cıne Gulluk Port Raılway

Survey, feasibility, preliminary and detailed design, and engineering services of 158.78 km double-track mix use conventional railway with 90 km/h operation speed. Minimum curvature radius is 3,500 m, and maximum vertical slope is 2.5% The project includes 3 stations, 251 culverts, 98 underpasses, 17 overpass, 82 bridges and viaducts with

11
Eki
Candarlı PORT

Survey, feasibility, detailed design of 6,000,000 TEU container port in accordence with EU Directives. In order to develop the multi modal transport and maritime trade, a container port in Çandarlı (İzmir) will be constructed. In this project feasibility report and EIA report were prepared by the Beneficiary. The Consultant was

09
Eki
Mersın PORT

Survey, feasibility, detailed design of 11,000,000 TEU container port in accordence with EU Directives. In order to develop the multi modal transport and maritime trade, a container port in Mersin will be constructed. In this project feasibility report and EIA report were prepared by the Beneficiary. The Consultant was responsible

20
Ara
Konya Mersın Hıgh Speed Raılway

Survey, feasibility, preliminary and detailed design, feasibility and engineering services of 339.35 km double-track high-speed railway line with 250 km/h operation speed. Minimum curvature radius is 3,500m, and maximum vertical slope is 1.6%. The project includes 9 stations, 453 culverts, 168 underpasses, 31 overpasses, 65 bridges and viaducts with a

08
Ara
Kayserı Sefaatlı Hıgh Speed Raılway

Survey, feasibility, preliminary and detailed design and engineering services of 158.78 km double-track high-speed railway line with 250 km/h operation speed. Minimum curvature radius is 3,500 m, and maximum vertical slope is 1.6%. The project includes 3 stations, 146 culverts, 58 underpasses, 16 overpasses, 12 bridges and viaducts with the

16
Kas
Bandırma Bursa Ayazma Hıgh Speed Raılway

Survey, feasibility, preliminary and detailed design, and engineering services of 150 km double-track highspeed railway line with 250 km/h operation speed. Minimum curvature radius is 3,500 m, and maximum vertical slope is 1.6%. The project includes 3 stations, 156 culverts, 86 underpasses, 8 overpasses, 36 bridges and viaducts with a

11
Eki
Van Ozalp Hıghway

Surveying, feasibility, detailed design and engineering services of 4 lane (2x2) 62.26 km highway between Van - Ozalp. The project includes 4 bridges with the total area of 3,142 m²  and engineering structures