Survey, feasibility, detailed design and engineering services of 11.24 km double tube metro line with 120 km/h operation speed.
-
Contract Date: 2010
-
client: Eren Holding Inc.
-
Name of Work: Detailed Design, Enginnering, Supervision and Consultancy Services of Eren Tekstil Factory
Eren Holdıng Wastewater Treatment Plant
Feasibility, detailed desing, engineering, construction supervision, andconsultancyservices of 01’s Factory. The project includes biological and chemical treatment plant with capacity of 32,000 m³/day, 3 water eeservoirs with capacity of 18,150 m³, 5 pumping stations with capacity of 390 lt/s, Cl2 chlorination station with capacity of 340 lt/s, ventilation station with the capacity of 243 m³ /h, wastewater pipeline system with the capacity of 2 km.