Survey, feasibility, detailed design and engineering services of 4 lane (2x2) 12.53 km highway between Hemsin Camlıhemsin. The project includes
-
Contract Date: 2005
-
client: General Directorate of Highways
-
Name of Work: Preparation of Detailed Retrofitting Design and Seismic Reinforcement of Bridges and Viaducts on O2-O3 Motorways Mahmutbey - Kozyatagi and Mahmutbey - Kinali Section (Km: 11+535 - 37+250 and Km: 11+535 - 81+818)