The project includes vulnerability assessment, detailed design and construction supervision of retrofitting works and related repair works of Eren
-
Contract Date: 2008
-
client: Central Finance and Contracts Unit (CFCU)
-
Name of Work: Technical Assistance for Construction of a new port in Çandarlı / İzmir
Candarlı PORT
Survey, feasibility, detailed design of 6,000,000 TEU container port in accordence with EU Directives. In order to develop the multi modal transport and maritime trade, a container port in Çandarlı (İzmir) will be constructed. In this project feasibility report and EIA report were prepared by the Beneficiary. The Consultant was responsible for the preparation of; Update/upgrade of the existing feasibility and EIA reports (notably EC requirements/guidelines on financial analysis (CBA), EIA and Habitat directives). The Implementation design of the project on site, preparation of the full tender dossier according to practical guide tendering process and FIDIC conditions of contract.