12
Ağu
Sıvas Erzıncan Hıgh Speed Raılway

Survey, Feasibility, Preliminary and Detailed Design and Engineering Services of 300 km double-track highspeed railway line with 250 km/h operation speed. Minimum curvature radius is 3,500 m, and maximum vertical slope is 1.6%. The project includes 4 stations, 336 culverts, 48 underpasses, 37 overpasses, 140 bridges and viaducts with the

17
Eki
Sanko Holdıng Textıle Factory Buıldıng

Design, Engineering, supervision, and consultancy services of Textile Factory Building and facilities. The project includes detailed structural, architectural, electrical and mechanical design report of textile factory building, consisting of 3 blocks, with the total construction area of 76.000 m² , and boiling facility, with the total construction area of 2.600

17
Eki
Seısmıc Retrofıttıng Works of EREN Textıle Factory

  The project includes vulnerability assessment, detailed design and construction supervision of retrofitting works and related repair works of Eren Textile Factory and Facilities, located in Yenibosna, Istanbul, to structurally strengthen the buildings to comply with the Earthquake Codes.  

01
Tem
Antalya Celtıkcı Hıghway

Survey, feasibility, preliminary and detailed design and engineering services of 4 lane (2x2) 72 km highway between Antalya - Celtikci. The project includes a double tube tunnel with the length of 1.536 km, and engineering structure. [gallery link="none" size="large" ids="1502,1503,1211"]  

01
Oca
Ataturk Olympıc Park

  Preparation of settlement plan of Ataturk Olympic Park (585 hectares), and detailed project report of connection roads and residental road with a total length of 26.34 km, 8 culverts, 1 intersection bridge, 2 rotary intersection (102,6 hectares), potable water distribution pipeline system with a total length of 17,334 m,