12
Ağu
Survey, Feasibility, Preliminary and Detailed Design and Engineering Services of 300 km double-track highspeed railway line with 250 km/h operation speed. Minimum curvature radius is 3,500 m, and maximum vertical slope is 1.6%. The project includes 4 stations, 336 culverts, 48 underpasses, 37 overpasses, 140 bridges and viaducts with the
