Survey, feasibility, preliminary and detailed design and engineering services of 158.78 km double-track high-speed railway line with 250 km/h operation
-
Contract Date: 2002
-
client: İstanbul Metropolitan Municipality
-
Name of Work: Detailed Design of Aksaray Square and Surrounding Area (1st Stage) Yenikapı District Road Systems and Connections, Yenikapı District Urban Design, Rail Systems Integration and Yenikapı Transfer Center Superstructure.