06
Oca
Esenyurt Avcılar Metro Lıne

Survey, feasibility, detailed design and engineering services of the 32 Km of Esenyurt – Avcilar Beylikduzu Metro Line in Istanbul with 16 underground stations. Total length of tunnel is 30.5 km with a lined cross sectional area of 31 m2. This project includes a viaduct with a length of 842.50

20
Ara
Eskısehır Antalya Hıgh Speed Raılway

Survey, feasibility, preliminary and detailed design, and engineering services of 654.74 km double-track highspeed railway line with 250 km/h operation speed. Minimum curvature radius is 3,500 m, and maximum vertical slope is 1.6 %. The project includes 10 stations, 840 culverts, 368 underpasses, 73 overpasses, 188 bridges and viaducts with

20
Ara
Konya Mersın Hıgh Speed Raılway

Survey, feasibility, preliminary and detailed design, feasibility and engineering services of 339.35 km double-track high-speed railway line with 250 km/h operation speed. Minimum curvature radius is 3,500m, and maximum vertical slope is 1.6%. The project includes 9 stations, 453 culverts, 168 underpasses, 31 overpasses, 65 bridges and viaducts with a

08
Ara
Kayserı Sefaatlı Hıgh Speed Raılway

Survey, feasibility, preliminary and detailed design and engineering services of 158.78 km double-track high-speed railway line with 250 km/h operation speed. Minimum curvature radius is 3,500 m, and maximum vertical slope is 1.6%. The project includes 3 stations, 146 culverts, 58 underpasses, 16 overpasses, 12 bridges and viaducts with the

16
Kas
Bandırma Bursa Ayazma Hıgh Speed Raılway

Survey, feasibility, preliminary and detailed design, and engineering services of 150 km double-track highspeed railway line with 250 km/h operation speed. Minimum curvature radius is 3,500 m, and maximum vertical slope is 1.6%. The project includes 3 stations, 156 culverts, 86 underpasses, 8 overpasses, 36 bridges and viaducts with a

12
Ağu
Sıvas Erzıncan Hıgh Speed Raılway

Survey, Feasibility, Preliminary and Detailed Design and Engineering Services of 300 km double-track highspeed railway line with 250 km/h operation speed. Minimum curvature radius is 3,500 m, and maximum vertical slope is 1.6%. The project includes 4 stations, 336 culverts, 48 underpasses, 37 overpasses, 140 bridges and viaducts with the