This project includes Detailed Design and Project Management Consultancy services during preconstruction and construction stage of various works in connection
-
Contract Date: 2014
-
client: Istanbul Metropolitan Municipality
-
Name of Work: Detailed Design of Incirli-Edirnekapi Gayrettepe- Sogutlucesme Metro Line
Esenyurt Avcılar Metro Lıne
Survey, feasibility, detailed design and engineering services of the 32 Km of Esenyurt – Avcilar Beylikduzu Metro Line in Istanbul with 16 underground stations. Total length of tunnel is 30.5 km with a lined cross sectional area of 31 m2. This project includes a viaduct with a length of 842.50 m, and a detailed depot area having capacity of 104 metro vehicles.