Construction supervision and consultancy of 69.5 km of double tube metro line (TBM) with 120 km/h operation speed. The project
-
Contract Date: 2017
-
client: General Directorate of Turkish State Railways
-
Name of Work: Supervision, Consultancy and Engineering Services of Ankara - Izmir High Speed Railway between (Banaz - Esme Section Km:268+000 - 364+600)




