03
Eki
Construction supervision, consultancy and engineering services of 25,6 km high speed railway with 160 km/h operation speed, 1 metro line with 80 km/h operation speed, and double track suburban railway with 80 km/h operation speed. The project includes 26 culverts, 5 underpasses, 5 overpasses, 1 pedestrian underpasses, 2 underground stations,
03
Eki
Construction supervision and consultancy of 69.5 km of double tube metro line (TBM) with 120 km/h operation speed. The project includes 17 underground stations, 2 depot areas, 69.5 km double tube TBM metro tunnel, 1500 V DC third rail electrification, all infrastructures works, track works, superstructure and stations, structural, architectural,
03
Eki
Construction supervision and consultancy services of 96.6 km double - track high speed railway with 250 km/h operation speed. The project includes 3 stations and siding stations, 136 culverts, 41 underpasses, 34 overpasses, 7 viaducts and 5 bridges
03
Oca
Construction supervision and consultancy services of 330 km 6 lane (2x3) motorway between Ankara-Nigde under BOT. The project includes 436 culverts, 24 overpass bridges, 3 underpass bridges, 19 junction bridges, 1 overpass, 126 underpasses, 4 viaducts with the total length of 3,472 m, 2 operation and maintenance centers, 6 park
01
Tem
The generated Lorem Ipsum is therefore always free from repetition, injected humour, or non-characteristic words etc,generated Lorem Ipsum is therefore always free from repetition, injected humour, or non-characteristic words etc.
01
Tem
Praesent a dui in tortor eleifend pellentesque vel eget sem. Duis et ipsum molestie, faucibus leo a, facilisis elit. Donec lobortis consequat turpis vel molestie.
01
Tem
"On the other hand, we denounce with righteous indignation and dislike men who are so beguiled and demoralized by the charms of pleasure of the moment, so blinded by desire, that they cannot foresee the pain and trouble that are bound to ensue; and equal blame belongs to those who
30
Eyl
Construction supervision and consultancy services of the 4 lane (2x2) 788 km highway project in Northern Antalya region. The project includes 26 bridges with a total length of 6,919.88 m, a tunnel with a length of 14.109 km.
31
Mar
Construction supervision and consultancy services of 143 km double-track high speed railway with 250 km/h operation speed. The project includes 209 culverts, 52 underpasses, 30 overpasses, 24 bridges with the total length of 5,963.77 meters, 4 highway junction bridges in 2 x (16.5 x 7 m) dimensions and with the
