Survey, feasibility, preliminary and detailed design, and engineering services of 158.78 km double-track mix use conventional railway with 90 km/h
-
Contract Date: 2005
-
client: General Directorate of Highways
-
Name of Work: Preparation of Detailed Retrofitting Design and Seismic Reinforcement of Bridges and Viaducts on O2-O3 Motorways Mahmutbey - Kozyatagi and Mahmutbey - Kinali Section (Km: 11+535 - 37+250 and Km: 11+535 - 81+818)

