• Contract Date: 2021
  • client: National Highways Authority of India (NHAI)
  • Name of Work:
    Consultancy Services to study the existing DPR/ contract provisions for 4 laning of Ramban Banihal Section (Km 151 to Km 187) under implementation and prepare revised DPR for critical locations to provide realignments / alternate solutions to the extent required in the form of tunnels / viaducts etc., to make such locations all weather traffic worthy and safe for operations.

Ramban Banıhal Road Sectıon

The project includes consultancy services to study the existing DPR / contract provisions of 36 km (2×2) lane highway of Ramban Banihal Section including 3 (2×2) lane tunnels witha total length of 7.8 km; 4 (2×1) lane tunnels with a total length of 1.091 km; 4 (2 x 2) lane viaducts with total length of 1.850 km and 2 (2×1) lane viaducts with total
length of 410 m.