Gıresun Hıghway

Survey, feasibility, detailed design and engineering services of 49.2 km 4 lane (2 x 2) highway between Gülyalı (Ordu) – Kesag (Giresun). The project includes 13 culverts, 9 elevated intersections, 19 bridges with the total length of 2.756 km, and 21 double tube tunnels with the total length of 39.672 km tunnel.

 

 

 

 

Related Projects