The project includes vulnerability assessment, detailed design and construction supervision of retrofitting works and related repair works of Eren
-
Contract Date: 2002
-
client: Delegation Of European Commision, Turkey
-
Name of Work: Sanlıurfa Drinking Water Project, Construction Work Supervision and Management Services
Sanlıurfa Drınkıng Water Project
Construction supervision of 35 km of primary drinking water transmission pipelines with nominal diameters ranging between 400 mm and 1,800 mm, several reinforced concrete reservoirs with a capacities 4,000 to 20,000 m³, including all associated structures, rehabilitation of existing reserviors, constructing and equipping pumping stations and all necessary connections to the existing secondary distribution system.

