Survey, Feasibility, Preliminary and Detailed Design and Engineering Services of 300 km double-track highspeed railway line with 250 km/h operation
-
Contract Date: 2017
-
client: General Directorate of Highways
-
Name of Work: Surveying, Design and Engineering Services of Section 2 Cerkes-Kursunlu Junction - Orta-Sabanozu State Road



