31
Ağu
Ankara Sıvas Hıgh Speed Raılway Section 3

Construction supervision and consultancy services of 27.5 km double-track high speed railway with 250 km/h operation speed. The project includes 25 culverts, 11 underpasses, 3 overpasses, 9 viaducts with the total length of 2,099 m, 1 bridge with the length of 30 m, 2 cut & cover tunnels with the

31
Mar
Ankara Sıvas Hıgh Speed Raılway

Construction supervision and consultancy services of 143 km double-track high speed railway with 250 km/h operation speed. The project includes 209 culverts, 52 underpasses, 30 overpasses, 24 bridges with the total length of 5,963.77 meters, 4 highway junction bridges in 2 x (16.5 x 7 m) dimensions and with the