02
Eyl
Istanbul Metro 4.Levent- Ayazaga

Construction Supervision of 13.731 km metro line. The project includes 3 underground stations, 9,832 m single tube main line tunnel (type A), 1,295 m single tube station platform tunnel (type P), 403 m single tube station platform tunnel (type PI), 620 m single tube switch tunnel (type T), 840 m