Feasibility, detailed desing, engineering, construction supervision, andconsultancyservices of 01's Factory. The project includes biological and chemical treatment plant with capacity
-
Contract Date: 2015
-
client: General Directorate of Turkish State Railways
-
Name of Work: Construction Supervision and Consultancy Services of Yerkoy-Sivas Section of Ankara-Sivas Railway Infrastructure Works
Ankara Sıvas Hıgh Speed Raılway
Construction supervision and consultancy services of 143 km double-track high speed railway with 250 km/h operation speed. The project includes 209 culverts, 52 underpasses, 30 overpasses, 24 bridges with the total length of 5,963.77 meters, 4 highway junction bridges in 2 x (16.5 x 7 m) dimensions and with the total length of 423.5 m, 9 viaducts with the total length of 4.625 m, 3 conventional junction bridges with a total length of 268.3 m, 5 cut and cover tunnels with a total length of 1.489 km, 9 tunnels with a total length of 14.593 km.