Ankara Sıvas Hıgh Speed Raılway Section 3

Construction supervision and consultancy services of 27.5 km double-track high speed railway with 250 km/h operation speed. The project includes 25 culverts, 11 underpasses, 3 overpasses, 9 viaducts with the total length of 2,099 m, 1 bridge with the length of 30 m, 2 cut & cover tunnels with the total length of 289 m, 6 NATM tunnels with the total length of 6,377.44 m.

Related Projects