Survey, feasibility detailed design and engineering services of 19 km double - track tramway line connecting major locations within the
-
Completion Date: 2019
-
client: General Directorare of Highways
-
Name of Work: Surveying, Detailed Design and Engineering Services of Section 3 Bartın Highway