Survey, feasibility, preliminary and detailed design, and engineering services of 4 lane (2x2) 22.96 km highway between Kahramanmaras and Goksun.
-
Contract Date: 2020
-
client: Border Roads Organization, India
-
Name of Work: Consultancy Services For Preparation of Feasibility Study (FS) And Detailed Project Report (DPR) For Construction of Rail Cum Highway Under Water Tunnel Including Approach Road Across Mighty River Brahmaputra, Approximately in Between Pachigaon (Jamuguri) And Kaliabor Tea Estate (Silghat) Under Project Vartak in Assam State
Rıver Brahmaputra Under Water Tunnel
The project includes preparation of Feasibility Study (FS) and Detailed Project Report (DPR) for construction of 12 km rail & highway under water tunnel including approach road across mighty river Brahmaputra in Assam State, located in the North East of India. The cross sectional area of the tunnel is 113.04 m2. The project also includes detailed design, economic and financial viability analyses, social and environmental action plans, study of the traffic pattern, alignment study using air born electromagnetic survey, 3-D geomodelling, design of safety passage, detailed cost estimates etc.