Survey, Feasibility, Preliminary and Detailed Design and Engineering Services of 300 km double-track highspeed railway line with 250 km/h operation
-
Completion Date: 2008
-
client: General Directorate of Highways
-
Name of Work: Preparation of Detailed Retrofitting Design and Seismic Reinforcement of Bridges and Viaducts on O-1, O-2 ,O-3 , O-4 Motorways and Connection