Survey, feasibility, detailed design and engineering services of 49.2 km 4 lane (2 x 2) highway between Gülyalı (Ordu) -
-
Completion Date: 2019
-
client: General Directorate of Highways
-
Name of Work: Surveying, Detailed Design and Engineering Services of Karabük Highway Section 1
Karabuk Hıghway Sectıon 1
Survey, feasibility, detailed design and engineering services of 16.25 km 4 lane (2×2) highway in Karabuk. The project includes 5 overpasses, 2 viaducts with the total length of 1.8 km, 2 bridges with the total length of 100.6 m, 4 double tube tunnels with a total length of 2.67 km