Survey, feasibility, preliminary and detailed design, and engineering services of 654.74 km double-track highspeed railway line with 250 km/h operation
-
Completion Date: 2013
-
client: General Directorate of Highways
-
Name of Work: Survey, Detailed Design and Engineering Services of Kahramanmaras-Goksun Road Tunnel Crossing and Access Roads
Kahramanmaras Goksun
Survey, feasibility, preliminary and detailed design, and engineering services of 4 lane (2×2) 22.96 km highway between Kahramanmaras and Goksun. The project includes 3 bridges with a total length of 940 m, 1 single stretch double tube tunnel with a length of 4.41 km, detailed digital mapping, traffic studies.