IZMIR Bornova Central Statıon ıncludıng Tunnels and Bornova Central Statıon

Survey, feasibility, detailed design and consultancy services of 1.146 km metro line with 80 km/hr operation speed in Izmir. The project includes 1.146 km tunnel with the cross – sectional area of 140.18m, structural, architectural, mechanical, electrical design of stations, electrification, signalization, and telecommunication systems.

 

 

Related Projects