This project includes Detailed Design and Project Management Consultancy services during preconstruction and construction stage of various works in connection
Istanbul Aırport Metro
Construction supervision and consultancy of 69.5 km of double tube metro line (TBM) with 120 km/h operation speed. The project includes 17 underground stations, 2 depot areas, 69.5 km double tube TBM metro tunnel, 1500 V DC third rail electrification, all infrastructures works, track works, superstructure and stations, structural, architectural, electrical and mechanical works, signalization & telecommunication works.