client: General Directorate of Highways
-
Name of Work: Detailed Design, Engineering and Consultancy Services of Gerede-Merzifon Motorway
Gerede Merzıfon Motorway
Survey, feasibility studies, preliminary and detailed design and engineering services of 346.3 km highway between Gerede and Merzifon. The project includes 6 lane (2×3) highway with a total length of 318.8 km, 4 lane (2×2) connection roads with the total length of 27.5 km, 571 culverts and underpasses, 54 overpasses, 21 intersection bridges, 11 intersection including bridge, 11 viaducts with the total length of 3.6 km, 29 bridges with the total length of 3.6 km including 1 balanced cantilever bridge with a largest span of 110 m, 23 double tube tunnels with a total length of 36.3 km.