• Contract Date: 2017
  • client: General Directorate of Turkish State Railways
  • Name of Work:
    Supervision, Consultancy and Engineering Services for Reconstruction of Tramway Line (GAZIRAY) between Başpınar - Gaziantep - Mustafa Yavuz Stations

GAZIRAY

Construction supervision, consultancy and engineering services of 25,6 km high speed railway with 160 km/h operation speed, 1 metro line with 80 km/h operation speed, and double track suburban railway with 80 km/h operation speed. The project includes 26 culverts, 5 underpasses, 5 overpasses, 1 pedestrian underpasses, 2 underground stations, 16 stations, 1 bridge with a length of 308 m, 1 cut & cover tunnel with a total length of 680 m, infrastructure works, track works, superstructure and stations, structural, architectural, electrical and mechanical works, signalization and telecommunication works.

 

28

Related Projects