Incırlı Edırnekapı Gayrettepe Sogutlucesme Metro Lıne

Survey, feasibility, detailed design and engineering services of the 32 Km of Esenyurt – Avcilar Beylikduzu Metro Line in Istanbul with 16 underground stations. Total length of tunnel is 30.5 km with a lined cross sectional area of 31.15 m². This project includes a viaduct with a length of 842.50 m, and a detailed depot area having capacity of 104 metro vehicle with the area of 140,187.97 m².

Related Projects