Survey, feasibility, preliminary and detailed design and engineering services of 158.78 km double-track high-speed railway line with 250 km/h operation
-
Completion Date: 2008
-
client: General Directorate of Highways
-
Name of Work: Survey, Detailed Design and Engineering Services of the Road Between Antalya Junction- Celtikci
Antalya Celtıkcı
Survey, feasibility, preliminary and detailed design and engineering services of 4 lane (2×2) 72 km highway between Antalya – Celtikci. The project includes a double tube tunnel with the length of 1.536 km, and engineering structure.