Construction supervision services of 4 lane (2x2) 45.5 km highway. The project includes 123 culverts, 5 overpasses, 7 underpasses, 2
-
Completion Date: 2014
-
client: General Directorate of Highways
-
Name of Work: Supervision, Consultancy and Engineering Services of Construction Kemerhisar and Niğde Connection Roads of Gölcük-Kemerhisar Section of Ankara- Pozantı Motorway
Ankara Pozantı HIGHWAY
Construction supervision of 6 lane (2×3) 44.5 km highway, and 4 lane (2×2) 17.7 km connection road. Total length of highway is 62.2 km. The project includes 255 culverts, 12 underpass bridges, 5 overpass bridges, 8 interchange bridges, Toll collection facilities in 4 different locations, 1 highway service facility (type B).