Ankara Izmır Hıgh Speed Raılway ( Banaz Esme SectIon)

Construction supervision and consultancy services of 96.6 km double – track high speed railway with 250 km/h operation speed. The project includes 3 stations and siding stations, 136 culverts, 41 underpasses, 34 overpasses, 7 viaducts with the total length of 4,370 m, 5 bridges with the total length of 170 m.

Related Projects