Survey, feasibility, detailed design, and engineering services of 4 lane (2x2) 16,4 km highway. The project includes 1 tunnel with
-
Completion Date: 2017
-
client: General Directorate of Turkish State Railways
-
Name of Work: Supervision, Consultancy and Engineering Services of Ankara - Izmir High Speed Railway between (Banaz - Esme Section Km:268+000 - 364+600)
Ankara Izmır Hıgh Speed Raılway ( Banaz Esme SectIon)
Construction supervision and consultancy services of 96.6 km double – track high speed railway with 250 km/h operation speed. The project includes 3 stations and siding stations, 136 culverts, 41 underpasses, 34 overpasses, 7 viaducts with the total length of 4,370 m, 5 bridges with the total length of 170 m.